2024 BMW M4 Competition at Frank Leta Acura
https://research.frankletaacura.com/cars/Used/2024/BMW/M4/Competition/174644572024 BMW M4 Competition
Selling Price : $72,497
Vehicle Basics
Additional Incentives
- Condition : Used
- Mileage : 27,559
- VIN : WBS33AZ04RCN83027
- Stock # : TB2018
- Engine :
- Transmission : 8-Speed Automatic Sport
- Ext. Color : Black
- Int. Color : Black
- Vehicle Type : Coupe
- Body Style : 2D Coupe
- Drivetrain : RWD
City MPG *
16
Hwy MPG *
23
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
One Owner/CARFAX No Accidents! Multi-Point Inspected and Emissions Tested! Service Records Available! Find out more at www.frankletaaccom. **AS-IS Vehicles Provide a Current Emissions Test**
- 3.0L Turbocharged I6 Engine with 503 Horsepower
- 8-Speed Automatic Sport Transmission
- M Shadowline Lights
- Front Ventilated Seats
- Carbon Fiber Trim
- Executive Package with Remote Engine Start and Power Tailgate
- BMW Curved Display with Head-Up Display
- Heated Steering Wheel
- Parking Assistance Package with Parking Assistant Plus
- M Compound Brakes with Red Calipers
- 19" x 9.5" Front and 20" x 10.5" Rear Wheels (Style 826M)
- Adaptive Suspension
- Connected Package Pro with Navigation System
- harman/kardon Surround Sound System with 16 Speakers
- Extended Merino Leather Upholstery with M Sport Seats
This 2024 BMW M4 Competition in Black delivers striking performance paired with refined luxury appointments. The turbocharged inline-six engine produces 503 horsepower while the responsive 8-Speed Automatic Sport transmission ensures smooth power delivery and spirited acceleration. Real-world efficiency comes in at an estimated 16 city and 23 highway miles per gallon.
The exterior showcases M Shadowline Lights and distinctive M styling that commands attention on any road. Inside, the cabin features Extended Merino Leather Upholstery with front ventilated seats and power adjustment for driver and passenger comfort. Carbon Fiber Trim accents throughout highlight this vehicle's premium positioning within the M lineup.
Comprehensive technology enhances every drive through the BMW Curved Display with integrated Head-Up Display, navigation system, and compatible smartphone integration via Apple CarPlay and Android Auto. The harman/kardon Surround Sound System with 16 speakers delivers premium audio quality. Connected Package Pro provides seamless access to BMW services and vehicle information.
Driver assistance and safety systems include the Parking Assistance Package with Parking Assistant Plus, rear parking camera, electronic stability control, traction control, and a comprehensive airbag system. M Compound Brakes with red calipers ensure confident stopping power matching the vehicle's performance capabilities.
This vehicle has been completely detailed and thoroughly inspected to deliver confidence in its condition and mechanical readiness for the next owner.
This BMW M4 Competition is backed by comprehensive multi-point inspection and emissions testing, confirming its roadworthiness and environmental compliance. The single-owner history with no reported accidents provides added assurance of careful stewardship throughout its ownership.
While great effort is made to ensure the accuracy of the information on this site, errors do occur so please verify information with a customer service rep. This is easily done by calling us at (314) 549-8020 or by visiting us at the dealership.
- 3.0L Turbocharged I6 Engine with 503 Horsepower
- 8-Speed Automatic Sport Transmission
- M Shadowline Lights
- Front Ventilated Seats
- Carbon Fiber Trim
- Executive Package with Remote Engine Start and Power Tailgate
- BMW Curved Display with Head-Up Display
- Heated Steering Wheel
- Parking Assistance Package with Parking Assistant Plus
- M Compound Brakes with Red Calipers
- 19" x 9.5" Front and 20" x 10.5" Rear Wheels (Style 826M)
- Adaptive Suspension
- Connected Package Pro with Navigation System
- harman/kardon Surround Sound System with 16 Speakers
- Extended Merino Leather Upholstery with M Sport Seats
This 2024 BMW M4 Competition in Black delivers striking performance paired with refined luxury appointments. The turbocharged inline-six engine produces 503 horsepower while the responsive 8-Speed Automatic Sport transmission ensures smooth power delivery and spirited acceleration. Real-world efficiency comes in at an estimated 16 city and 23 highway miles per gallon.
The exterior showcases M Shadowline Lights and distinctive M styling that commands attention on any road. Inside, the cabin features Extended Merino Leather Upholstery with front ventilated seats and power adjustment for driver and passenger comfort. Carbon Fiber Trim accents throughout highlight this vehicle's premium positioning within the M lineup.
Comprehensive technology enhances every drive through the BMW Curved Display with integrated Head-Up Display, navigation system, and compatible smartphone integration via Apple CarPlay and Android Auto. The harman/kardon Surround Sound System with 16 speakers delivers premium audio quality. Connected Package Pro provides seamless access to BMW services and vehicle information.
Driver assistance and safety systems include the Parking Assistance Package with Parking Assistant Plus, rear parking camera, electronic stability control, traction control, and a comprehensive airbag system. M Compound Brakes with red calipers ensure confident stopping power matching the vehicle's performance capabilities.
This vehicle has been completely detailed and thoroughly inspected to deliver confidence in its condition and mechanical readiness for the next owner.
This BMW M4 Competition is backed by comprehensive multi-point inspection and emissions testing, confirming its roadworthiness and environmental compliance. The single-owner history with no reported accidents provides added assurance of careful stewardship throughout its ownership.
While great effort is made to ensure the accuracy of the information on this site, errors do occur so please verify information with a customer service rep. This is easily done by calling us at (314) 549-8020 or by visiting us at the dealership.
Vehicle Features
- Navigation
- Navigation System
- Connected Package Pro
- Executive Package
- Parking Assistance Package
- 16 Speakers
- AM/FM radio: SiriusXM with 360L
- harman/kardon Surround Sound System
- harman/kardon® Speakers
- Radio data system
- Radio: AM/FM Audio System
- SiriusXM w/360L
- Air Conditioning
- Automatic temperature control
- Front dual zone A/C
- Rear window defroster
- Lumbar Support
- Memory seat
- Power driver seat
- Power steering
- Power windows
- Remote Engine Start
- Remote keyless entry
- Steering wheel mounted audio controls
- Adaptive suspension
- Four wheel independent suspension
- Speed-sensing steering
- Traction control
- 4-Wheel Disc Brakes
- ABS brakes
- Dual front impact airbags
- Dual front side impact airbags
- Emergency communication system: BMW Assist eCall
- Front anti-roll bar
- Knee airbag
- Low tire pressure warning
- M Compound Brakes w/Red Calipers
- Occupant sensing airbag
- Overhead airbag
- Rear anti-roll bar
- Power Tailgate
- Brake assist
- Electronic Stability Control
- Exterior Parking Camera Rear
- Auto High-beam Headlights
- Delay-off headlights
- Fully automatic headlights
- Panic alarm
- Security system
- Speed control
- Auto-dimming door mirrors
- Bumpers: body-color
- Heated door mirrors
- M Shadowline Lights
- Parking Assistant Plus
- Power door mirrors
- Spoiler
- Turn signal indicator mirrors
- Apple CarPlay & Android Auto Compatibility
- Auto-dimming Rear-View mirror
- BMW Assist eCall
- BMW Curved Display w/HUD
- BMW TeleServices
- Carbon Fiber Trim
- Compass
- ConnectedDrive Services
- Driver door bin
- Driver vanity mirror
- Front reading lights
- Garage door transmitter
- Heated Steering Wheel
- Illuminated entry
- Leather Shift Knob
- Leather steering wheel
- Outside temperature display
- Overhead console
- Passenger vanity mirror
- Personal eSIM 5G
- Rear reading lights
- Rear seat center armrest
- Sport steering wheel
- Tachometer
- Telescoping steering wheel
- Tilt steering wheel
- Trip computer
- Widescreen Display
- Extended Merino Leather Upholstery
- Front Bucket Seats
- Front Center Armrest
- Front Ventilated Seats
- Heated Front Seats
- Heated front seats
- M Sport Seats
- Power Front Seats
- Power passenger seat
- Split folding rear seat
- Passenger door bin
- Alloy wheels
- Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M)
- Wheels: 19" x 9.5" Fr/20" x 10.5" Rr Silver
- Rain sensing wipers
- Speed-Sensitive Wipers
- Variably intermittent wipers
- Fully Detailed
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.